Projects

project1

Manor Holiday Park, Hunstanton

This was a fast-turnaround project with Willow pumps contracted to replace the two existing pumping stations consisting of Tuke and Bell pump units, which were over 30 years old. The scope of work included demolishing the original brick buildings, removing the old pumps and redesigning a new independent pump stations, while retaining existing wet wells and.. Read More

project2

More London

More London is a prestigious development situated opposite London Bridge station, Willow have been involved with supplying and installing package pump stations complete with pumps and controls, pump sizes ranging from 100mm to 50mm pumps using abs and Homa products to complete our works. Willow have carried out this work on plots 3, 4 &.. Read More

project3

St Thomas Hospital

Willow undertook on behalf of the hospital a project to reduce energy costs for the Primary and Constant Heating pumps which serves one of there ward wings up to 13 floors high, it was to remove 8off existing Pullen pumps approx age of 15 years to be replaced with Grundfos NBE 40 – 200 – 198 invertor driven and 4 No Grundfos NBE 65 –160 – 165 invertor driven pumps. Read More

project4

Rye Harbour Pump Station

Rye Harbour is an existing Southern Water pumping stations that came under the Morrison Utilities refurbishment program. Morrison’s awarded Willow the refurbish contract to bring the station back to the Southern Water M&E renewals standard. The pumps and controls were free issue from Morrison’s under the SWA framework agreement, Willow supplied and installed the following.. Read More